-- card: 106962 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 3633 -- name: Consolidating Master Project -- part 17 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=56 right=84 bottom=463 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 18 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=82 right=188 bottom=463 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: TextField2 -- part contents for background part 6 ----- text ----- MacProject II can calculate the schedule and costs of a project family. MacProject II takes into account not only the subprojects linked directly to the master project, but also the rest of the project family. This process is called consolidating a project family. MacProject II does not perform these calculations automatically. You must request the consolidation yourself. When you consolidate a project family, the changes are stored only in the current project document. -- part contents for background part 27 ----- text ----- Subproject Dates & Durations -- part contents for background part 28 ----- text ----- Consolidating a Project Family -- part contents for card part 17 ----- text ----- To consolidate the schedule and costs of a project family: -- part contents for card part 18 ----- text ----- Choose Consolidate Project Family from the Dates menu. Important: If you cancel the consolidation part way through, you should finish the analysis later by again choosing Consolidate Project Family, or you should revert to the previously saved version of the document.